Lean Total Process Management (Lean TPM)
The Total Process Management (Lean TPM) System
TPM-Element: Focused Improvements
The pillar “focused improvement” is the most important pillar in the Lean TPM system. As Zero-error-processes are aspired, it’s first necessary to acquire and visualize all errors and losses. The development of a key performance indicator system covering an area down to team / employee level transpires with the basic indicators
which is the basis of this evaluation.
With this as a basis, it’s possible to visualize detailed information about losses and wastes using the structure of the “16 losses”.
The 3 Main Categories of Losses are:

Only through priorization of losses and wastes by interdisciplinary enhancement-teams is an enduring enhancement of the information system possible and quantifiable.



